Who was Grenville Mellen Dodge and what was his connection to the transcontinental railroad?
Who was Grenville Mellen Dodge and what was his connection to the transcontinental railroad?
On May 10, 1869, Dodge and Samuel Montague, the Central Pacific’s chief engineer, set the final spike of the transcontinental railroad at Promontory Point, Utah. Resigning from his engineering position with the Union Pacific, Dodge left his 14-room mansion that overlooked the railroad and Missouri River for New York.
What problems did Grenville Dodge overcome to build tracks over Sherman’s pass?
What problems did Grenville Dodge overcome to build track over Sherman’s Pass? Unremitting winds created huge drifts.
What is unique about the Dodge House?
Dodge was designated a National Historic Landmark. This special honor was bestowed upon the home of General GM Dodge, not because of the house itself, but rather because of the man who lived in it. To achieve this designation the site must have local, state, and national significance.
Where is the Dodge House located?
Council Bluffs
What is the connection between the Dodge family and the black angel?
The Black Angel honors Ruth Anne Dodge, the wife of General Dodge and commemorates her 1916 death. The Black Angel was sculpted by Daniel Chester French also created the famed seated Abraham Lincoln inside the Lincoln Memorial in Washington, D.C. and the minuteman in Concord, Massachusetts.
Who is the Black Angel?
The Black Angel is an eight-foot tall bronze statue that stands over the graves of three members of the Feldevert family. The stories associated with the statue tell of its mysterious change in color.
What is the Black Angel of Death?
Azrael
Who was at the Golden Spike ceremony?
Politicians, officials of the Central Pacific and Union Pacific Railroads, railroad workers (including a Chinese contingent from the Central Pacific), five companies of soldiers from the 21st U.S. Infantry Regiment, and members of the public from near and far were in attendance.
Why are there rocks under train tracks?
Track ballast forms the trackbed upon which railroad ties (sleepers) are laid. It is packed between, below, and around the ties. It is used to bear the load from the railroad ties, to facilitate drainage of water, and also to keep down vegetation that might interfere with the track structure.
How long did they have to complete the railroad?
six years